
TT□-7□□□ Automatic Peak-Valley Power Scheduling Temperature Controller (Power-Failure Memory Timing Temperature Controller)
Product Introduction: 1. Integrates automatic regulation of industrial parameters and automatic timing control. 2. Automatic peak-avoidance time can be set according to local peak/valley electricity prices, heating electric water tanks or performing process heat treatment on workpieces during valley periods; the investment can generally be recovered within a few dozen days. 3. Power-failure data memory, accurate timing and good stability. Suitable for electric water heaters, large heat-treatment furnaces and electric thermal storage devices, offering extremely high performance for the price.
Main Technical Parameters: 1. Basic error: ≤±1.0% F.S + 1d; ≤±0.5% F.S + 1d (two grades); 2. Regulation mode: two-position, time-proportioning or two-position PID; 3. Control point deviation: none; 4. Peak/valley time setting: arbitrary (24-hour system); 5. Peak insertion operation: panel touch key control; 6. Clock mode: hour/minute; real-time clock; 7. Time control error: ≤5 seconds/day; 8. Power-failure memory of real-time time and other parameters and running time: ≥12 hours (new built-in battery)